Open a Primavera P6 XER file
Drop the XER: the activities, the work breakdown structure, the relationships, the calendars and the resources are read, and the schedule is recalculated. Primavera P6 is not required.
Drop a schedule file
Microsoft Project XML, Primavera P6 XER, GanttProject .gan, CSV or .xlsx table, .mpp recognised. Or
This table, column by column
Check what each column holds before reading. A table read wrong does not show: it gives a plausible schedule that is false.
Schedule quality check
Gap between the file and the recalculation
Three-week look-ahead
What the reader noticed
Comparison with another version
The open file is the earlier version. Drop the version to compare.
When to use it
The XER is what Primavera P6 produces to hand a schedule over. It travels between client and contractor, often monthly, and it has to be read before answering.
Primavera P6 is expensive, and rare inside a company. The file, on the other hand, reaches everyone.
What this page does
- Activities, with their original, remaining and completed durations, and their type.
- The project's work breakdown structure: each node becomes a summary task, and the hierarchy is rebuilt.
- Relationships between activities, with their type and lag.
- P6 calendars, including standard weeks and dated exceptions, read from the string P6 writes into the file.
- Resources and their assignments.
What it does not do: Activity codes, user-defined fields and resource curves are not used. Klargantt does not write XER files back: the return trip goes through Project XML, a workbook or a CSV.
What is read
- The Primavera P6 XER, tab-delimited (
%T,%F,%R,%E), all current versions. - The
TASK,TASKPRED,PROJWBS,CALENDAR,RSRCandTASKRSRCtables. - The Windows-1252 encoding P6 writes by default.
No file is uploaded: the schedule is read by your browser, in this tab, and the page is not allowed to open a connection to any other site.
Frequently asked questions
- How do I export an XER from Primavera P6?
- In P6: File, Export, choose "Primavera PM (XER)", select the project, then save. The detailed guide.
- What about a P6 XML file?
- Primavera XML is not read yet. The XER is, in full, and it is the format P6 offers first.
- Are P6 calendars taken into account?
- Yes. P6 writes its calendars as a compact string, with a standard week and dated exceptions. That string is read, and the working hours it describes drive the recalculation.
Other pages
- Open an .mpp file : Microsoft Project's native format, the one nobody opens without Project.
- Open a Project XML : Microsoft Project's interchange format, read in full and written back.
- Open a GanttProject .gan : GanttProject's format, read without installing GanttProject.
- Convert a schedule to Excel : An .xlsx workbook with real dates and real numbers, not text.
- Convert a schedule to PDF : A Gantt chart paginated from A4 to A0, or one single page for a plotter.